Project Overview:
Supply and Delivery of Construction Materials on an “As-and-When-Required” Basis – UNAMI Headquarters, Diwan Compound, International Zone, Baghdad, Iraq
Provided the ongoing supply and delivery of construction materials to the UNAMI Headquarters at the Diwan Compound, located within the International Zone (Green Zone), Baghdad, Iraq, under an as-and-when-required framework to support continuous maintenance, refurbishment, and construction activities.
The scope of supply covered a broad range of civil, architectural, and finishing materials, including but not limited to cement, sand, aggregates, concrete products, blocks, bricks, steel reinforcement, structural steel items, gypsum boards, insulation materials, tiles, adhesives, sealants, paints, coatings, timber, plywood, doors, hardware, fasteners, roofing materials, and general construction accessories.
All materials were sourced in compliance with approved technical specifications and quality standards, and delivered through secure logistics and controlled access procedures in a high-security environment. The service ensured timely availability, flexible quantities, and rapid response to urgent site requirements, minimizing downtime and supporting uninterrupted project execution.
This assignment demonstrates proven capability in framework supply contracts, supply-chain coordination, and reliable material delivery for large international organizations operating within sensitive and secure locations.