{"id":940,"date":"2026-02-02T09:22:24","date_gmt":"2026-02-02T09:22:24","guid":{"rendered":"https:\/\/lamco-iq.com\/?p=940"},"modified":"2026-02-11T16:37:41","modified_gmt":"2026-02-11T16:37:41","slug":"construction-finishing-with-amwaj-at-alkhadmya-new-city","status":"publish","type":"post","link":"https:\/\/lamco-iq.com\/ar\/construction-finishing-with-amwaj-at-alkhadmya-new-city\/","title":{"rendered":"Construction &amp; finishing with Amwaj at alkhadmya new city"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":4,"featured_media":979,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[14],"class_list":["post-940","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-portfolio","tag-contract"],"acf":{"work_content":"Construction &amp; Finishing Works \u2013 Amwaj, Al-Khadmiya New City\r\nThe company successfully executed construction and finishing works in collaboration with Amwaj at the Al-Khadmiya New City project. The scope included structural coordination works alongside architectural finishing activities such as painting, floor and wall tiling, installation of partition walls, and related finishing elements. All works were performed in accordance with approved drawings, material specifications, and project quality standards, with strict adherence to safety requirements and the approved construction schedule.","work_content_source":{"label":"Work Content","type":"textarea","formatted_value":"Construction &amp; Finishing Works \u2013 Amwaj, Al-Khadmiya New City\r\nThe company successfully executed construction and finishing works in collaboration with Amwaj at the Al-Khadmiya New City project. The scope included structural coordination works alongside architectural finishing activities such as painting, floor and wall tiling, installation of partition walls, and related finishing elements. All works were performed in accordance with approved drawings, material specifications, and project quality standards, with strict adherence to safety requirements and the approved construction schedule."},"client":"Amwaj ","client_source":{"label":"Client","type":"text","formatted_value":"Amwaj "},"timeline":"2022","timeline_source":{"label":"Timeline","type":"text","formatted_value":"2022"},"service_used":"Construction ","service_used_source":{"label":"Service Used","type":"text","formatted_value":"Construction "},"gallery":"","gallery_source":{"label":"Gallery","type":"gallery","formatted_value":false}},"_links":{"self":[{"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/posts\/940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/comments?post=940"}],"version-history":[{"count":1,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/posts\/940\/revisions"}],"predecessor-version":[{"id":941,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/posts\/940\/revisions\/941"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/media\/979"}],"wp:attachment":[{"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/media?parent=940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/categories?post=940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lamco-iq.com\/ar\/wp-json\/wp\/v2\/tags?post=940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}